Lodge Working Bees
2020 Working Bee Task List (Postponed due to COVID-19)
2020 Working Bee Task List (Postponed due to COVID-19)
- Flashing
- Painting eaves
- Move the lounge room heater and install a new flue
- Design new safety surround for lounge room heater
- New cowling for drying room flue
- Ski storage area – under the bunkroom – cleaning, LED lighting, blocking holes for possums and drafts, removing junk, insulating.
- Build ski boot rack in day ski storage area – need some extra wood for shelve backing
- Stabilise and concrete the stone walls
- Insulate & Repair ceiling in family room where flue penetrates roof
- Remove old water tank from under lodge and replumb outlet to drain and possibly replace water tank.
- Paint the drying room
- Roof - replace loose nails with screws and install through roof flashing mat for older flues – remove redundant flue.
- Hazchem signs for gas.
- Repair gas lights
- Veranda door bolt – needs some work
- New drying rack for gloves etc in drying room
Talaria Task List - June 2019 | |
File Size: | 44 kb |
File Type: |
Pre-Season Working Bee Checklist | |
File Size: | 20 kb |
File Type: | xls |
Fire Extinguisher Service Record | |
File Size: | 32 kb |
File Type: |
Fire Alarm Checklist | |
File Size: | 36 kb |
File Type: |
Generator Maintenance Record | |
File Size: | 29 kb |
File Type: | xls |